New mobility track demonstration at IDEX 2011 |
|
|
|
Sunday,
02 January 2011, 17:30 PM |
|
|
|
IDEX
2011 the new mobility track demonstration with 14 obstacles. |
|
|
|
As
for each edition of the international defence exhibition
IDEX, the organizers of the fair make it possible to all
exhibitors to present their vehicles and equipment on the
mobility track demonstration. |
|
Dynamic
track demonstration area IDEX 2009
|
|
For
this edition 2011 of IDEX, which is also the 10° anniversary
of the event, the mobility track demonstration area was
improved with 7 new obstacles. In exclusiveness on the
site Army Recognition, the new mobility track demonstration
of IDEX 2011, with the detail of all the obstacles.
|
|
|
|
1.
Roling Hills (Same IDEX 2009)
L:
12 - W: 7 - H: 0.6 CD: 0.6 |
|
2.
K-Water (NEW)
L:
50 - W: 8 - H: 1,2 (Water Depth) - 54 (L) Critical Dimension
|
|
3.
Sideslope 25 deg (NEW)
L:20 - W: 5.5 - H: 2.0 - 25deg (Critical Dimension)
|
|
4.
Rough Concrete Road (NEW)
L:20
- W: 8 - H: 0.25 - CD:0.25 (H) |
|
5.
Log Roll (NEW)
L:
7 - W: 4.5 - H: 0.6 - CD: 0.6 (H) |
|
6.
Ditch (NEW)
L:
10-20 - W: 10-5.5 - H: 0.2 (Depth) - CD: 0.2 (H) |
|
7.
J-Ramp (Same IDEX 2009)
L:
9 - W: 5.5 - H: 0.8 (Ramp) - CD: 0.8 (H) |
|
8.
H-Ramp / Broken Bridge (Same IDEX 2009)
L:
20-30 - W: 5.5 - H: 1.35 (Ramp) - CD: 1.8 (Gap)
|
|
9.
E-Water (Same IDEX 2009)
L:
45 - W: 8 - H: 1.8 (Water Depth) - CD: 2.0 (H) |
|
10.
Low Hill (NEW)
L:
50 - W: 5 - H: 2.7 - CD: 5 (W) |
|
11.
Snake Climb (NEW)
L:
25 - W: 4 - H: 0-2.7 - CD: 2.7 (H) |
|
12.
Stairs (NEW)
W:
6 - L: 3.5 - H: 2.5 - CD: 0.15 (Step height) |
|
13.
Vertical Step (NEW)
W:
5 - L: 0.5 - H: 0.8 (Step Height) - CD: 0.8 (H) |
|
14.
Concrete Pile (NEW)
L:7
- W: 4-5 H: 0.6 - CD: 5(W) |