Breaking news
United States department of defense has ordered 70 BAE Systems M777 lightweight howitzers 0310114.
a | |||
Defense Industry News - BAE Systems |
|||
Monday, October 3, 2011, 12:31 AM | |||
United States department of defense has ordered 70 BAE Systems M777 lightweight howitzers. | |||
BARROW-IN-FURNESS,
United Kingdom – The U.S. Department of Defense has ordered 70 BAE
Systems lightweight M777
howitzers to begin equipping the U.S. Army’s Infantry Brigade Combat
Teams (IBCTs). Valued at $134m (£87m), the order takes the U.S.-UK
production programme to October 2013 and a total of 1071 guns.
|
|||
The order follows a $21m (£13m) contract in July to design, develop, qualify and manufacture an improved Power Conditioning Control Module (PCCM). This is the battery charging system that provides stable power to the Digital Fire Control System. Over the next four years, 1049 units will be produced for fitting to in-service guns. The
improved PCCM must be lighter but deliver better reliability and accommodate
future accessories, such as electronic thermal management and laser ignition.
It will also allow the use of lithium ion, as well as the current lead-acid,
batteries. Weighing in at less than 4200kg, the revolutionary M777 is the world’s first artillery weapon to make widespread use of titanium and aluminium alloys, resulting in a howitzer which is half the weight of conventional towed 155mm systems. As a result, it can be deployed by medium-lift helicopter quickly and beyond the reach of roadside bombs to otherwise inaccessible areas, extending its reach over the theater of operations. BAE Systems’ facility at Hattiesburg, Mississippi, is responsible for final integration and test of the weapon system. The prime contract management of the M777 program and manufacture and assembly of the complex titanium structures and associated recoil components are undertaken at Barrow-in-Furness in the United Kingdom. |
|||