Breaking news
US approves sale of Integrated Air Defense Weapon System and more to India.
The U.S. State Department has made a determination approving a possible Foreign Military Sale to India of an Integrated Air Defense Weapon System (IADWS) for an estimated cost of $1.867 billion. The Defense Security Cooperation Agency delivered the required certification notifying Congress of this possible sale on February 7, 2020.
U.S. Marine Corps Sgt. Christopher P. Roseblossom (left), a low altitude air defense (LAAD) gunner with the 2nd LAAD Battalion, fires an FIM- 92 Stinger missile (Picture source: Lance Cpl. Cody J. Ohira/U.S. Marine Corps)
The Government of India has requested to buy an Integrated Air Defense Weapon System (IADWS) comprised of: 5 AN/MPQ-64Fl Sentinel radar systems; 118 AMRAAM AIM-120C-7/C-8 missiles; 3 AMRAAM Guidance Sections; 4 AMRAAM Control Sections; and 134 Stinger FIM-92L missiles. Also included are 32 M4A1 rifles; 40,320 M855 5.56mm cartridges; Fire Distribution Centers (FDC); Handheld Remote Terminals; Electrical Optical/Infrared (EO/IR) Sensor Systems; AMRAAM Non-Developmental Item-Airborne Instrumentation Units (NDIAIU); Multi-spectral Targeting System-Model A (MTS-A); Canister Launchers (CN); High Mobility Launchers (HML); Dual Mount Stinger (DMS) Air Defense Systems; Vehicle Mounted Stinger Rapid Ranger Air Defense Systems; communications equipment; tool kits; test equipment; range and test programs; support equipment; prime movers; generators; technical documentation; computer-based training equipment; training equipment; training towers; ammunition storage; training and maintenance facilities; infrastructure improvements; U.S. Government and contractor technical support, engineering and logistics support services; warranty services; Systems and Integration Checkout (SICO); field office support; and other related elements of logistics and program support. The total estimated cost is $1.867 billion.
The principal contractors involved in this program are The Raytheon Corporation and Kongsberg Defense and Aerospace. There are no known offset agreements proposed in conjunction with this proposed sale; however, the purchaser typically requests offsets. Any offset agreement will be defined in negotiations between the Purchaser and the prime contractor(s).
Implementation of this proposed sale will require 60 U.S. Government or contractor representatives to travel to India for a period of six weeks (non-concurrent). Activities will include de-processing/fielding, training, and technical/logistics support.
This notice of a potential sale is required by law and does not mean the sale has been concluded.