- Army
- Air Defense Systems
- Anti-tank systems and vehicles
- Armored Vehicles
- Armoured personnel carriers
- Artillery Vehicles and Weapons
- Command Post
- Communication Vehicles and Systems
- Electronic Warfare
- Engineer | Maintenance Vehicles
- Infantry Fighting Vehicles
- Main Battle Tanks
- Missiles
- Tactical and Logistic Vehicles
- Radars
- Unmanned Systems
- Weapons
- Navy
- Air
Terrex 3 APC IFV
Terrex 3 8x8 APC armored vehicle personnel carrier
|
||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||
The Terrex 3 is the latest variant in the Terrex 8x8 APC (Armoured Personnel Carrier) family designed and manufactured by ST Kinetics of Singapore mainly for export requirements. This version offers more volume, payload, and protection. A scale model of the vehicle was unveiled during the edition 2016 of Eurosatory International Defense Exhibition in Paris, France and it was shown for the first time during the DVD event in September 2016. The Terrex 3 has a weight of 35 tons, five tons more than the Terrex 2 but offering more payload. The vehicle is also one of the candidates for the Land 400 program for the Australian Army under the name of Sentinel 2, a joint project led by Elbit Systems of Australia.
|
||||||||||||||||||||||||||||||||||||
Variants: | ||||||||||||||||||||||||||||||||||||
- Terrex 1: The first version of the vehicle with a gross vehicle weight of 24,000 kg was unveiled at the DSEi Defense Exhibition held in London late in 2001.
- Terrex 2: The Terrex 2 is an improved variant of the Terrex 1 8x8 armored vehicle personnel carrier designed and manufactured by ST Kinetics of Singapore. The Terrex 2 was unveiled for the first time at DSEI, the International Defense Exhibition in September 2015. - Sentinel 2: developed jointly ST Kinetics of Singapore and Elbit Systems Australia to meet the Australian Land 400 Phase 2 requirement but was not shortlisted by the Australian Army. |
||||||||||||||||||||||||||||||||||||
Technical Data | ||||||||||||||||||||||||||||||||||||
Back to top | ||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||
Back to top | ||||||||||||||||||||||||||||||||||||