Skip to main content

Fincantieri Launched the 8th FREMM 'Antonio Marceglia' for Italian Navy.


| 2018

The launching ceremony of the “Antonio Marceglia” frigate, the eighth of a series of 10 FREMM vessels - Multi Mission European Frigates, took place Ferbuary 3rd 2018 at the integrated shipyard of Riva Trigoso (Genoa) in the presence of the Italian Minister of Defence, Roberta Pinotti and, on behalf of the Chief of Defence, General Claudio Graziano, the Chief of Staff of the Italian Navy, Admiral Valter Girardelli. The 10 FREMM vessels have been commissioned to Fincantieri by the Italian Navy within the framework of an Italo-French cooperation program under the coordination of OCCAR (Organisation Conjointe de Cooperation sur l’Armement, the international organization for cooperation on arms).


Fincantieri Launched the 8th FREMM Antonio Marceglia for Italian NavyLaunching ceremony of the “Antonio Marceglia” frigate, the eighth of a series of 10 FREMM vessels.


The President of Fincantieri, Giampiero Massolo, and the CEO, Giuseppe Bono, played host to Giovanni Toti, Governor of the Liguria Region, in addition to a number of civil and religious authorities.

After the launching, fitting activities will continue in the Integrated naval shipyard of Muggiano (La Spezia), with delivery scheduled in 2019. The “Antonio Marceglia” vessel, like the other units, will feature a high degree of flexibility, capable of operating in all tactical situations. 144 metres long with a beam of 19.7 metres, the ship will have a displacement at full load of approximately 6,700 tonnes. The vessel will have a maximum speed of over 27 knots and will provide accommodation for a 200-person crew.

The FREMM program, representing the European and Italian defence state of the art, stems from the renewal need of the Italian Navy line “Lupo” (already removed) and “Maestrale” (close to the attainment of operational limit) class frigates, both built by Fincantieri in the 1970s.

The vessels “Carlo Bergamini” and “Virginio Fasan” have been delivered in 2013, the “Carlo Margottini” in 2014, the “Carabiniere” in 2015, the “Alpino” in 2016, and the “Luigi Rizzo” in 2017. The Italian program has been fully implemented with the option exercised in April 2015, regarding the construction of the ninth and tenth vessel, whose delivery is scheduled after 2020.


Copyright © 2019 - 2024 Army Recognition | Webdesign by Zzam