Breaking news
Army 2019: new LMT-K light mine clearing system mounted on Typhoon-K armored vehicle.
| 2019
In the area dedicated to the 2019 innovations selected by the organizer, one can see an LMT-K light engineer mine clearing system mounted on a Typhoon-K 53949 armored vehicle.
LMT-K light engineer mine clearing system mounted on a Typhoon-K 53949 (Picture source: Army Recognition)
The device itself weighs 3 tonnes and requires less than one hour to be mounted but only 30 seconds to be released. It clears two lanes of 1.20 meter wide each. The 16-ton Typhoon K-53949 on which the mine clearing device is mounted can reach 50 km/h in this configuration.
The 350 hp engine of the Typhoon K enables the vehicle to reach 105 km/h without the mine clearing device. Six people can take place in the vehicle.